Alcan LTD. (SECAL), Arvida

Location

Arvida, Québec, Canada

Contract Value

2 500 000. $ CA

Duration

11 months

End of the work

January 1985

Fluoride plant.

Fabrication, supply and installation of all the carbon steel piping (hydrate, wash lines, filtering).